BIM Services
BIM Coordination Services
We run the coordination process that turns separate architectural, structural and MEP models into one buildable, conflict-free federated model — and we keep it that way as the design develops.
What BIM coordination actually involves
Clash detection finds the conflicts. Coordination is the work of resolving them: agreeing who moves, updating the models, re-running the tests, and recording the decision so it is not re-litigated three weeks later. We do that work as an extension of your team, on your standards and in your file structure.
How we run it
- Federate the models. We assemble the architectural, structural and MEP models into a single coordinated model, aligned to your shared coordinate system and level naming.
- Run the tests. Clash tests are set up by discipline pair and by system, with tolerances you set, so the report lists real conflicts rather than thousands of nuisance hits.
- Triage and assign. Every clash is grouped, prioritised and assigned to the discipline that should resolve it, with a proposed resolution where we can offer one.
- Resolve and re-test. We make the agreed model changes within our scope, re-run the tests, and confirm the conflict is closed.
- Report and track. Issues are tracked through to closure and reported in a format your team can take straight into a coordination meeting.
What you receive
- Federated coordination model, updated at each agreed cycle
- Clash matrix and prioritised clash report, grouped by discipline and system
- BCF issue files for round-tripping with your own authoring software
- Coordination meeting pack, with viewpoints and screenshots for each open issue
- Issue tracker showing status, owner and resolution history
Where it fits in your programme
Coordination is most valuable before drawings are issued for construction, when a conflict still costs a model change rather than a site instruction. We typically join at the point the disciplines first have modelled content to compare, and run cycles through to sign-off. Where you have already started, we can pick up an existing model set and take over the coordination cycle.
Who this is for
- Architects who need a coordinated set before issuing construction documents
- MEP consultants and contractors coordinating services against structure
- General contractors running coordination across multiple trade models
- Design teams without an in-house BIM coordinator, or covering one who is stretched
How we work with you
Every engagement is quoted in writing before work begins, with the scope, cycle count, software, standards and hourly rate stated up front. We work in your naming conventions and your common data environment, and we do not stamp, seal or take professional responsibility for design decisions — coordination is production support for your design team.
Have a model set that needs coordinating?
Send us the discipline models and your standards, and we will come back with a written quotation, a cycle plan and a firm delivery date.